Precast Concrete Facility

PROJECT FACTS

Well Connected Alliance

East Tamaki, Auckland

August 2012 – April 2013

PROJECT CASE STUDY

Part of the Waterview Tunnel Connection project this facility was built to manufacture around 24,000 tunnel segments forming the inner walls of the twin three-lane tunnels. Work included:

A 6,000m2 heavy industry warehouse of structural steel and precast concrete structure with coloursteel roofing and cladding on a reinforced concrete slab.

Batch plant foundations, column plinths and underground hoppers, channel drains including all excavations, subgrade prepping, concrete slabs and thickenings, and waterproofing of the proposed holding pit.

  • Love1
PROJECT FACTS

Well Connected Alliance

East Tamaki, Auckland

August 2012 – April 2013

PROJECT CASE STUDY

Part of the Waterview Tunnel Connection project this facility was built to manufacture around 24,000 tunnel segments forming the inner walls of the twin three-lane tunnels. Work included:

A 6,000m2 heavy industry warehouse of structural steel and precast concrete structure with coloursteel roofing and cladding on a reinforced concrete slab.

Batch plant foundations, column plinths and underground hoppers, channel drains including all excavations, subgrade prepping, concrete slabs and thickenings, and waterproofing of the proposed holding pit.

  • Love1

AUCKLAND

35 George St, Kingsland, Auckland 1024
PO Box 52 099, Newmarket, Auckland 1149
T: 09 845 0100

SEND US AN EMAIL

© 2025 Cassidy Construction. All rights reserved | Sitemap

  • linkedin
Close Menu
  • Home
  • Health, Safety & Environment
  • About
    • Services
    • People
    • Standards
    • Community
  • Work
  • Clients
  • Careers
  • Contact
  • linkedin