Skip to main content
Close Search
Cassidy Construction
search
Menu
  • Home
  • About
    • Our Story
    • First Choice
    • National Coverage
  • Capability
    • Self-Performing
    • Health & Safety
    • Quality
    • ECI
    • BIM
    • Maintenance
  • Projects
    • Current Projects
    • Civic
    • Civil
    • Commercial
    • Education
    • Food & Beverage
    • HV Electrical
    • Industrial
    • Infrastructure
    • Service Stations
  • People
    • Our Team
    • Careers
    • Learning & Development
  • Sustainability
    • Social & Cultural
    • Environmental
    • Economic
  • News
  • Contact
  • linkedin
  • search

Rosmini College Classroom Block

PROJECT CASE STUDY

Catholic Diocese of Auckland

Takapuna, Auckland

November 2019 - May 2021

Cassidy Construction was main contractor in delivery of this three-level classroom block, each floor of which extends to about 650m2. Housing 12 separate learning spaces, including purpose-designed music and food technology classrooms, the new facility provides capacity for the school to accommodate a roll increase to 1200 students.

What made this project both interesting and challenging is that the primary structure is all in-situ concrete, with the ground floor suspended off the ground and sitting on 30m-long steel driven piles. Cassidy’s self-performing capability came to the fore during the 18-month build, with both the concreting and carpentry trades drawn from our highly experienced in-house team.

Before starting construction, our team built a 200m haul road across a field to safely access the site. Further complexity was added by the fact that the field and the edge of the building site were formerly a landfill site, so we had to manage the additional hazard of methane gas leaching from the ground at our build location.

  • Love0
PROJECT CASE STUDY

Catholic Diocese of Auckland

Takapuna, Auckland

November 2019 - May 2021

Cassidy Construction was main contractor in delivery of this three-level classroom block, each floor of which extends to about 650m2. Housing 12 separate learning spaces, including purpose-designed music and food technology classrooms, the new facility provides capacity for the school to accommodate a roll increase to 1200 students.

What made this project both interesting and challenging is that the primary structure is all in-situ concrete, with the ground floor suspended off the ground and sitting on 30m-long steel driven piles. Cassidy’s self-performing capability came to the fore during the 18-month build, with both the concreting and carpentry trades drawn from our highly experienced in-house team.

Before starting construction, our team built a 200m haul road across a field to safely access the site. Further complexity was added by the fact that the field and the edge of the building site were formerly a landfill site, so we had to manage the additional hazard of methane gas leaching from the ground at our build location.

  • Love0
Logo
  • About
    • Our Story
    • First Choice
    • National Coverage
  • Capability
    • Self-Performing
    • Health & Safety
    • Quality
    • ECI
    • BIM
    • Maintenance
  • Projects
  • People
  • Sustainability
  • News
  • Contact
SEND US AN EMAIL

© 2026 Cassidy Construction. All rights reserved | Sitemap

  • linkedin
Close Menu
  • Home
  • About
    • Our Story
    • First Choice
    • National Coverage
  • Capability
    • Self-Performing
    • Health & Safety
    • Quality
    • ECI
    • BIM
    • Maintenance
  • Projects
    • Current Projects
    • Civic
    • Civil
    • Commercial
    • Education
    • Food & Beverage
    • HV Electrical
    • Industrial
    • Infrastructure
    • Service Stations
  • People
    • Our Team
    • Careers
    • Learning & Development
  • Sustainability
    • Social & Cultural
    • Environmental
    • Economic
  • News
  • Contact
  • linkedin