Skip to main content
  • linkedin
Close Search
Cassidy Construction
search
Menu
  • Home
  • Health, Safety & Environment
  • About
    • Services
    • People
    • Standards
    • Community
  • Work
    • Current Projects
    • Civic
    • Civil
    • Commercial
    • Education
    • Food & Beverage
    • HV Electrical
    • Industrial
    • Infrastructure
    • Service Stations
  • Clients
  • Careers
  • Contact
  • search

Oji Paper Packaging Facility

PROJECT CASE STUDY

Oji Fibre Solutions

Penrose, Auckland

April 2016 – March 2017

Australasia’s largest fibre-based packaging manufacturer engaged us to construct a 3800m2 warehouse extension around an operating manufacturing plant, including work within hygiene areas where food packaging was made.

Our role included upgrading the hygiene facility to current food manufacturing standards, as well as work on the internal offices, industrial hall transition zone, pallet store, fork hoist corridor and hardstand pavement area.

The brief also included upgrading the existing building to the current fire code by installing a new sprinkler system, pump house and underground mains piping. Plus, we installed an extensive new mechanical ventilation system in the hygiene, office and production areas.

Our works programme was phased to facilitate installation of new manufacturing equipment without disrupting the client’s production schedule, and accelerated to meet deadlines requested by the client. This accelerated programme meant it was critical that we had the resource and risk controls in place to ensure that our people, client staff and logistic operators could operate safely.

  • Love0
PROJECT CASE STUDY

Oji Fibre Solutions

Penrose, Auckland

April 2016 – March 2017

Australasia’s largest fibre-based packaging manufacturer engaged us to construct a 3800m2 warehouse extension around an operating manufacturing plant, including work within hygiene areas where food packaging was made.

Our role included upgrading the hygiene facility to current food manufacturing standards, as well as work on the internal offices, industrial hall transition zone, pallet store, fork hoist corridor and hardstand pavement area.

The brief also included upgrading the existing building to the current fire code by installing a new sprinkler system, pump house and underground mains piping. Plus, we installed an extensive new mechanical ventilation system in the hygiene, office and production areas.

Our works programme was phased to facilitate installation of new manufacturing equipment without disrupting the client’s production schedule, and accelerated to meet deadlines requested by the client. This accelerated programme meant it was critical that we had the resource and risk controls in place to ensure that our people, client staff and logistic operators could operate safely.

  • Love0

AUCKLAND

35 George St, Kingsland, Auckland 1024
PO Box 52 099, Newmarket, Auckland 1149
T: 09 845 0100

SEND US AN EMAIL

© 2026 Cassidy Construction. All rights reserved | Sitemap

  • linkedin
Close Menu
  • Home
  • Health, Safety & Environment
  • About
    • Services
    • People
    • Standards
    • Community
  • Work
    • Current Projects
    • Civic
    • Civil
    • Commercial
    • Education
    • Food & Beverage
    • HV Electrical
    • Industrial
    • Infrastructure
    • Service Stations
  • Clients
  • Careers
  • Contact
  • linkedin