Our role here was to conduct a complete structural strengthening of Watercare’s Redoubt Reservoir, including 46 concrete anchor blocks and steel plates.
Although the reservoir was drained to allow access, the project took place in confined conditions.
The work was completed without network interruption and commissioned on time.