Liston College gym completed interior
Liston College Gym building closed in
interior fitout of the new gym at liston college by cassidy construction
wide angle aerial view of liston college gym under construction
external architectural rendering of Liston college gym building
cassidy construction excavator on site
cassidy construction team and digger on liston college site
exclusion zone sign on cassidy construction Liston College site