This project showcases Cassidy Construction’s ability to complete a highly technical building to a very high standard while managing ongoing extreme weather conditions and addressing multiple design complexities in collaboration with the architect.
Because we self-performed excavation, concrete structure, timber framing, cladding install and finishing works, we were able to run a flexible programme to mitigate design and weather delays. Our in-house BIM team provided structure, external joinery and site support.
The two-level steel and concrete building houses specialist teaching spaces including a dance studio with timber sprung floor, soundproof practice rooms, a music room, art and sculpture spaces, offices, shower and change facilities.
It is clad in brick, fibre cement sheet, precast concrete and vertical metal cladding, with a sculptural folded-metal facade above the entrance. The interior features ply ceilings and balustrades and polished concrete floors.
The site’s location at the school’s main entry posed health and safety challenges, but we worked closely with school staff to mitigate any risks and minimise disruptions from deliveries and noise.
Despite the logistical hurdles, our team rose to the challenge and delivered a building we are proud of. We have received very positive feedback from the client.
This project showcases Cassidy Construction’s ability to complete a highly technical building to a very high standard while managing ongoing extreme weather conditions and addressing multiple design complexities in collaboration with the architect.
Because we self-performed excavation, concrete structure, timber framing, cladding install and finishing works, we were able to run a flexible programme to mitigate design and weather delays. Our in-house BIM team provided structure, external joinery and site support.
The two-level steel and concrete building houses specialist teaching spaces including a dance studio with timber sprung floor, soundproof practice rooms, a music room, art and sculpture spaces, offices, shower and change facilities.
It is clad in brick, fibre cement sheet, precast concrete and vertical metal cladding, with a sculptural folded-metal facade above the entrance. The interior features ply ceilings and balustrades and polished concrete floors.
The site’s location at the school’s main entry posed health and safety challenges, but we worked closely with school staff to mitigate any risks and minimise disruptions from deliveries and noise.
Despite the logistical hurdles, our team rose to the challenge and delivered a building we are proud of. We have received very positive feedback from the client.