Watercare
Waiuku, Auckland
November 2022
We received a project brief early November 2022 for a new temporary water treatment plant to be designed, built, commissioned and live in 3 months – by late January 2023.
The scope included: install an existing Lutra safewater unit, a new pump set within a modified container, in-ground storm and waste water drainage and treated water and waste water tanks. In addition: all the associated electrical design and installation including new switch boards, the mechanical pipework design, install and commissioning, site preparation including forming and pouring a new yard slab, securing fencing and gates.
The team were aware of the tight timeframe, plus current material and labour shortages and the Christmas break mid project. By focusing on solutions, we delivered on time.
Commissioning was underway from mid January 2023 with acceptance to service pushed out due to the flooding events that occurred late January.
Watercare
Waiuku, Auckland
November 2022
We received a project brief early November 2022 for a new temporary water treatment plant to be designed, built, commissioned and live in 3 months – by late January 2023.
The scope included: install an existing Lutra safewater unit, a new pump set within a modified container, in-ground storm and waste water drainage and treated water and waste water tanks. In addition: all the associated electrical design and installation including new switch boards, the mechanical pipework design, install and commissioning, site preparation including forming and pouring a new yard slab, securing fencing and gates.
The team were aware of the tight timeframe, plus current material and labour shortages and the Christmas break mid project. By focusing on solutions, we delivered on time.
Commissioning was underway from mid January 2023 with acceptance to service pushed out due to the flooding events that occurred late January.